C
cammy0102
I had a good chat with the guy over the phone before. He said he doesn't have a problem with me applying for building control and he doesn't want the work held up if building control person doesn't turn up as he'll have to pay the 2 guys. He confirmed in an email that he'll be reasonable and only charge extra if their work is delayed by a day.