Discuss Bathroom job. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

Whn1

Plumbers Arms member
Plumber
Gas Engineer
Messages
1,331
Two days graft (I didn't do the tiling) got some snagging, basin and floating toilet to fit on other side will post finished pics up on Monday.

Here's the before, mid and after.
ImageUploadedByTapatalk1360953347.529750.jpgImageUploadedByTapatalk1360953374.902733.jpgImageUploadedByTapatalk1360953391.264451.jpg

ImageUploadedByTapatalk1360953439.132896.jpgImageUploadedByTapatalk1360953454.228440.jpgImageUploadedByTapatalk1360953472.339787.jpg
 
Explained to them about the fully tiled, unaccessable panel. But they wasn't interested... what can you do.
 
I wouldn't know, I have a vagin
 
Thanks mate, always copper unless it's more feasible To use plastic, ie new builds/secondary returns.
 
Plasterboard, what time did you get up this morning?
 
Status
Not open for further replies.

Reply to Bathroom job. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top