B
Bunker
My custard wants us to put a tall towel rail in his utility room. Single storey extension with a loft directly above. The new (oil) boiler is in the same room. Vented system. F&R go up from the boiler and along the loft.
He wants the towel rail piped from above onto the top of the rad.
I cant see any reason not too, we could Tee AAVs on the pipe above - does this sound ok?
Thanks
He wants the towel rail piped from above onto the top of the rad.
I cant see any reason not too, we could Tee AAVs on the pipe above - does this sound ok?
Thanks