Discuss Poorly fitted terminal in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

Backboiler

Plumbers Arms member
Plumber
Gas Engineer
Messages
396
I come across this quite a lot. Anyone else spend their time filling with mortar? 2012-11-26 10.39.00.jpg
 
Last edited:
It is chargable so who cares. A bag of quick set and a bag of sand is under a tenner. You will get a 50x return on it.
 
Yea this is the last one!!
 

Attachments

  • image.jpg
    image.jpg
    94.4 KB · Views: 34
What would you do?
1. Get the last man in (hopefully he/she is a GSR).
OR

2. Put it straight and collect the payment.
 
Last edited:
llc fail it, and get a call back:)
moaning customer service ,extra work get some more money plus £10 for not offering me a drink!
nice customer, lots of tea and bics, couple of bricks and motar and a few quid and be back for next years service
 
Status
Not open for further replies.

Reply to Poorly fitted terminal in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi all. Hope you have all been keeping well. A while back I decided I only wanted to fit one brand of boiler and decided on Viessmann due to...
Replies
9
Views
475
Every two weeks or so I have to go and top up the system because the hot taps are running cold. Boiler display is flashing 0.6 bar and I fill up...
Replies
2
Views
342
PSxxxxxx
P
Hello I am looking to install a slimline dishwasher (integrated) into a cupboard in my kitchen. The depth of the dishwasher is 550mm and the...
Replies
22
Views
697
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
539
Fitted unvented hotwater cylinder building control looking forms signed it off job was in england i am qualified northern ireland send out a form...
Replies
4
Views
270
Back
Top