Discuss New boiler quotes, what's the going rate? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
Im only doing an air pressure test. But will go to the required pressure. With as much water in the system as I can to reduce air volume.Don't forget to test to manufacturers specification
Im only doing an air pressure test. But will go to the required pressure. With as much water in the system as I can to reduce air volume.
It SHOULD be water only due to H&S being a diyer I can choose to ignore those. Fill it with water then pump up, be minimal air volume.Needs to be water mate
It SHOULD be water only due to H&S being a diyer I can choose to ignore those. Fill it with water then pump up, be minimal air volume.
It SHOULD be water only due to H&S being a diyer I can choose to ignore those. Fill it with water then pump up, be minimal air volume.
plastic piping now its becoming clearer any alarm bells ringing shaun , harvest , town ?What if any cleaning steps should be done. In emails he said that a water flush through will be carried out. Seeing as its brand new everything and plastic piping is that all that's required.
Is there something wrong with plastic piping?plastic piping now its becoming clearer any alarm bells ringing shaun , harvest , town ?
The best I can do short of hiring a hydraulic tester, is to fill with water and pump up the air will at least rise to the high points so everything else will be hydraulic tested. I'm pretty sure there won't be any leaks the bits I have done so far have held 2 bar overnight.It appears like your quite competent, just go ahead and do it. Air testing plastic pipework ain't a brilliant method for tightness testing but it better than no test
Most of us prefer a system to be completely copperIt appears like your quite competent, just go ahead and do it. Air testing plastic pipework ain't a brilliant method for tightness testing but it better than no test
The OP has pipes his own rads? I think? Then the boiler man is doing the rest? Think I'm right there.plastic piping now its becoming clearer any alarm bells ringing shaun , harvest , town ?
The best I can do short of hiring a hydraulic tester, is to fill with water and pump up the air will at least rise to the high points so everything else will be hydraulic tested. I'm pretty sure there won't be any leaks the bits I have done so far have held 2 bar overnight.
Reply to New boiler quotes, what's the going rate? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.