Discuss GRANT Air Source Heat Pumps in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
How long has this fiasco been going on
I read you mentioned october which is just before the weather came, but how has the performance been previous
 
How long has this fiasco been going on
I read you mentioned october which is just before the weather came, but how has the performance been previous
October 2010 is when they were first fired up after installation and they have never run correctly at all
 
Sorry for negative but, if heat pump manufacurers were honest aout the cop you wouldnt be able to mortgage the building. They are only as clean as where u get ur lekkie from ha
 
Sorry for negative but, if heat pump manufacurers were honest aout the cop you wouldnt be able to mortgage the building. They are only as clean as where u get ur lekkie from ha

your not being negative, but factual and what you say is very true and until all properties are built to sustainable code level 6 were all doomed, by the way welcome to the forum
 
They are supposed to be arranging a site meeting with a guy from Grant and a guy from plumbase who supplied them where the Grant guy is going to prove that they are working correctly and there is not a problem with them at all I personally can't wait....

I have passed on Quality's details on to my customer who is aiming to get him down to evaluate them and hopefully find the problem....
 
thatll be interesting to find out what they all think, got any pics of the installation?
 
No I don't but there is not much to see from outside and would need rather a large memory card to photograph the entire installation it's a big place....
 
On another note I evaluated a install in kidderminster. Long story short 30W per square meter was calculated for the heat output which would not have been too far wrong exept for 3.6m room height throughout the whole building plus a massive amount of glazing on the first floor and second floor and nearly half of the roof.
My report to the specifier was entertaining.
 
sounds like you need soft start fitting my boss had one fitted at a cost of £250
 
no news they were meant to have done it three weeks ago but nowt happened will ask and see whats going on with it. think in my earlyer post the price is wrong wasnt particularly listening was about 7pm on a friday :26:

can the air source be staggered somehow so they dont start at exactly the same time?
 
Last edited by a moderator:
Status
Not open for further replies.

Reply to GRANT Air Source Heat Pumps in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock