M

mike_s

when is this qualification needed? When does commisioning a commercial boiler become classed as commissioning plant and equipment needing this acs qualification?

This week I'm sitting my commercial heating changeover as got a quote for a commercial boiler but it's just an 85kw with no boosters or anything special on the gas side of things.

After some research it seems that this qualification was designed for people who commision only and not install? Meaning I would not need it as I'll have ciga-1. The only info I could find on this was a report from icom in 2007. I have e-mailed energy and utility skills (eu skills) to clear this up, they are very helpful and the people to ask if anyone isn't sure on what they need so they don't work out of scope.

From a quick search on the gsr it shows most commercial firms don't have this and most training places don't offer it so I doubt it's needed. Anyone know more?
 
Last edited by a moderator:
I think plant and equiptment is things like gas engines. Gas generators.

With com. It's wet heating. Dry heating. Radiant plaque.

If its not heating then you may need another ticket

BTW. Get up1 and 1a. Very grey area of you don't IMO
 
I've got up1a and icpn. After some research it seems the plant commissioning cert was designed as more of a limited scope type of qual for people who commission only.

I completed my commercial changeover with ciga, cdga and cort 1. I also have my catering and commercial laundry quals which I've needed on top of my domestic ng and lpg. Happy I have all the tickets I'm likely to need for now and have more commercial gas work coming in :)
 
Status
Not open for further replies.

Reply to CCP1 - commissioning plant and equipment in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Can anyone recommend a decent multi meter, preferably under a 100 pounds. It's for checking boiler components so I don't need a top spec one...
Replies
7
Views
292
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
541
I have an ideal vogue max S18 boiler and I’m considering fitting auto balancing TRVs, my question relates to the boilers pump. I see a boiler...
Replies
1
Views
181
I have had a look at previous posts and think I know the answer to this but just before I make it worse could I just check what you think about...
Replies
7
Views
253
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
425
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock