Design–build (or design/build, and abbreviated D–B or D/B accordingly) is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It can be subdivided into architect-led design–build (ALDB, sometimes known as designer-led design–build) and contractor-led design–build.
In contrast to "design–bid–build" (or "design–tender"), design–build relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.
Design-build also has a single point responsibility. The design-build contractor is responsible for all work on the project, so the client can seek legal remedies for any fault from one party.The traditional approach for construction projects consists of the appointment of a designer on one side, and the appointment of a contractor on the other side. The design–build procurement route changes the traditional sequence of work. It answers the client's wishes for a single point of responsibility in an attempt to reduce risks and overall costs. It is now commonly used in many countries and forms of contracts are widely available.
Design–build is sometimes compared to the "master builder" approach, one of the oldest forms of construction procedure. Comparing design–build to the traditional method of procurement, the authors of Design-build Contracting Handbook noted that: "from a historical perspective the so-called traditional approach is actually a very recent concept, only being in use approximately 150 years. In contrast, the design–build concept—also known as the "master builder" concept—has been reported as being in use for over four millennia."Although the Design-Build Institute of America (DBIA) takes the position that design–build can be led by a contractor, a designer, a developer or a joint venture, as long as a design–build entity holds a single contract for both design and construction, some architects have suggested that architect-led design–build is a specific approach to design–build.
Design-build plays an important role in pedagogy, both at universities and in independently organised events such as Rural Studio or ArchiCamp.

View More On Wikipedia.org
  1. D

    New build

    I've got an opportunity for around 20 new builds all combis going in, 2-4 bed houses. All central heating pipe work and rads etc. hot and cold pipe work to be run to bathroom, ensuite and cloakroom and kitchen areas. What sort of price should I be looking at? Anyone with with much experience...
  2. M

    Plume kit causing rain water build up in boiler - solution??

    Hi all. Went to a breakdown a few weeks ago. Potterton Promax, 4 months old, water dripping very slowly from bottom of outer case. Took case off, air box door off, no obvious signs of a leak. Checked flow switch first, dry as a bone. No wet patches on outside of combustion chamber, or inside...
  3. M

    No hot water from bath taps in new build

    Hi all, looking for some advice and opinions on our situation, we moved into a new build last June and due to en suite bathrooms with showers we've never felt the need to use the bath. We've just last week tried to run a bath and found that there's no hot water from either the hot tap or cold...
  4. B

    New build issues

    Hi all , just wanted some opinions / guidance on two things , i moved into a new build house 5 months ago and two of the first snags were pop up waste for bath failed ( the type where you turn overflow to open and shut) and the mastic started gapping around bath . Both of these were corrected...
  5. M

    Central heating choice on New build

    hi all I am currently building a new house (bungalow), and until now we where always going to have part of the house with underfloor heating and the rest of the rooms with radiators. Until the Contractor asked us, why do we want radiators at all! (the contractor is a good reputable guy, so I...
  6. Inverness

    programmer that is build into the wocester combi 30 greenstar

    Worcester 30 green star cdi has a programmer at the front of the boiler but no room stat fitted. The customer has asked for my optionin about a Honeywell thermostat 7 day programmer radio signal. For this to get installed would it be best practice to remove the Worcester build in programmer? As...
  7. K

    New build heating, pipe runs?

    Hi all, I've always been a maintenance and small works engineer (ie retrofit) So... I've been asked to do the heating in my cousins new single story annex and was after some advice on running heating pipework. I've quoted for UFH but as money is tight I want to offer a price for rad's too...
  8. M

    Mr Wilsons full system build

    Greetings Folks... i decided to start my own build log for an upcoming project im undertaking over the next year. My main reason for starting a log is so that any questions i have i wont have to repeat information about the build and it will all be in one place and as i progress im hoping that...
  9. M

    new build plumbing

    Many people worked on new build housing? having my first run of working on this. Pretty shocked at the standard of work/ carelessness of peoplew
  10. P

    Self Build UFH With Radiators

    I am not in the profession so please bear with me... For a larger energy-efficient self-build house the design has allowed for UFH on the ground floor and radiators upstairs (5 bed) coupled to a Greenstar CDi. The downstairs UFH is zoned, but with simple (polypipe) thermostats, rather than...
  11. K

    How do I increase the pressure of my Tribune HE Tank

    My heating has stopped working and I think it may be because the pressure is now 0. It's meant to be 1.5. When I moved into my new build the builders showed me what to do and I can't remember.
  12. M

    New build in copper

    Hi has anyone got much experience of doing new builds in copper? Got some to do there traditional joist not the engineered ones.
  13. M

    Bath and basin waste combined on new build

    Hi if combining a bath and basin waste on a new build should you really run 2 inch and reduce to 1.5 inch after the tee to the basin?
  14. M

    New build house 3 joists together notch or drill?

    Hi, I have a 3 floor new build house to first fix that at two places on each floor there are 3 joists but up together. I think due to the staircase. Would/ has any one drilled through with an angled drill 3 joists in a row? Or the other option would be notching But I hear there is strict...
  15. H

    Ventilation and meter housing

    Hello First post - found this forum via a google search and a similarish question 3 years ago. I am not a professional and am not attempting diy - just wondering if guidance re cavities and meter housing could be cleared up a bit more for me. Situation is we moved into new home, discover...
  16. S

    New build - is the system the builders are proposing any good???

    Hi everyone, newbie and complete novice here so hoping for advice to help stop us making a costly error! I'm in the process of buying a new build house and the builder has informed us of a change of specification, away from an unvented (I think that's what it's called; pressurised cylinder in...
  17. M

    New build plumber doing gas safe?

    Hey I work for a building firm as a plumber, the plumber I work with at the firm is leaving. The firm is on about putting me through my gas, for this would I need to build a gas portfolio? Would other people guessed getting gas safe registered is a good idea? I realize it will mean a bit of...
  18. S

    Career advice needed please?

    I would very much appreciate some advice on the following - I have been after a apprenticeship in plumbing for a long time and I think I might of finally nabbed a job with a company which is great news. Full nvq and training. However my passion has been to work with a plumber who mainly deals...
  19. R

    Buying a new build house

    Evening all. For the past 8 years I've been renting houses but it's getting frustrating having to keep moving. After a messy and highly costly divorce several years ago I swore id never buy another house but I've decided that Kate is a keeper so I'm taking the plunge again. The best deal seems...
  20. L

    New build flooring.

    Excuse the naivety, I have never worked on new builds. The other week we had a job on a house that was roughly 2 years old to move an upstairs rad. I wanted to keep the job neat so tried to keep all pipe work under the floor. I cut the section of floor I wanted to lift, however, once I'd...