Search the forum,

build

Design–build (or design/build, and abbreviated D–B or D/B accordingly) is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It can be subdivided into architect-led design–build (ALDB, sometimes known as designer-led design–build) and contractor-led design–build.
In contrast to "design–bid–build" (or "design–tender"), design–build relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.
Design-build also has a single point responsibility. The design-build contractor is responsible for all work on the project, so the client can seek legal remedies for any fault from one party.The traditional approach for construction projects consists of the appointment of a designer on one side, and the appointment of a contractor on the other side. The design–build procurement route changes the traditional sequence of work. It answers the client's wishes for a single point of responsibility in an attempt to reduce risks and overall costs. It is now commonly used in many countries and forms of contracts are widely available.
Design–build is sometimes compared to the "master builder" approach, one of the oldest forms of construction procedure. Comparing design–build to the traditional method of procurement, the authors of Design-build Contracting Handbook noted that: "from a historical perspective the so-called traditional approach is actually a very recent concept, only being in use approximately 150 years. In contrast, the design–build concept—also known as the "master builder" concept—has been reported as being in use for over four millennia."Although the Design-Build Institute of America (DBIA) takes the position that design–build can be led by a contractor, a designer, a developer or a joint venture, as long as a design–build entity holds a single contract for both design and construction, some architects have suggested that architect-led design–build is a specific approach to design–build.
Design-build plays an important role in pedagogy, both at universities and in independently organised events such as Rural Studio or ArchiCamp.

View More On Wikipedia.org
  1. A

    New Build - Pipes Not Secured In Walls

    Would someone kindly advise if it’s accceptable for water pipes within walls to a basin be lose and not secured with significant play? Thanks in advance.
  2. H

    Condensation build up in pump pcb G 30CDI?

    I have been working on a Grecnstar 30CDI system boiler which had a pump fault. There are no leaks on the boiler and it has had a replacement pump and a full service. I got called back as the elec tripped. I checked the pump and there appeared to be moisture in the sealed PCB housing on the pump...
  3. R

    New build upstairs pipework order of & markings

    Hi All, Currently doing a new build that has underfloor heating downstairs and radiators upstairs. From the image provided can anyone tell me in order from left to right what each one of these pipes does by the way the plumber has marked them with tape. Thanks.
  4. Scott_D

    New build............................

    Does anyone do new build? I s there an generic price list? I have been asked to price up a block of 9 new build flats.
  5. H

    Botched kitchen tap plumbing in a new build?

    Been living in a new build for 4 years, my kitchen tap recently broke. Took pictures of it to B&Q for advice and they told me I wouldn't be able to fix it on my own as it looks like a botched job (copper pipes directly into the tap rather than a mixer?) Can anyone confirm if and what has went...
  6. S

    3 year old new build flat - Powerflush required??

    Hi all - looking for some quick advice and all opinions welcomed! Question: Is it really possible for a 3 year old new build flat Ideal Combi 35 to have "Multiple component failure due to poor water quality - drain down & powerflush required to inhibit future related issues, which are now...
  7. S

    3 year old new build flat - Powerflush required??

    Hi all - looking for some quick advice and all opinions welcomed! Question: Is it really possible for a 3 year old new build flat Ideal Combi 35 to have "Multiple component failure due to poor water quality - drain down & powerflush required to inhibit future related issues, which are now...
  8. R

    New build plumbing and heating engineers sites in Crewe and Chester, weekly pay

    I have immediate starts for engineers in Crewe and Chester, 3 years secured work, excellent rates of pay. Message me if you have any questions, we can meet up on site if you wish for a look around and go through the target sheets, all materials delivered to site and weekly pay.
  9. C

    Faulty stopcock in new build

    Evening all, I moved into a new build flat about 2 months ago and last week the nut on the stopcock broken and caused the water supply pipe to come completely loose, thus quite a big leak followed. Looking at the stopcock that broke (photo attached) I believe a secondhand/faulty stopcock was...
  10. Peckerman

    Part L on a new build.

    This is my first post so please go easy on me!! I've been asked to price for a complete heating system with a combi and new hot and cold pipework throughout on a new build project, I've not really done new builds before so I just wanted to check on the latest regs for Part L, it's a 3 story...
  11. S

    Help Required!!! Onsite Portfolio to build

    Hi Guys I've recently finished my gas course, now need to build the onsite portfolio (14 jobs) which is required before I can get the ACS booked. Before gas safe registration Bit of info about me! Ive been a sparky for 16 yrs and have lots of heating knowledge, I have done G3 unvented and solid...
  12. hammers4spanner

    Work

    Gone rather quiet last 4 months only decent month was weirdly January . Got enough work to get by but would prefer it to be busier . Trying to come up with ideas to drum up work . Thing is two routes of advertising i use have both changed and it has defo had an impact on my work. Thinking...
  13. G

    Securing sub contract work

    Hi guys I am recently trained and Gas Safe Registered. I am currently trying to build clientele for Gas Safety Certs and PAT testing. Thinking of going it alone (currently dual fuel meter fitting but it's a slog at my age and having been self employed for 20 years in various guises it's hard...
  14. GQuigley67

    New build plumbing certification

    Evening folks got a new build to price, guy wants certification included in the price, I guess I contact the local council for that? What prices would you be looking at?
  15. S

    New build

    Hi Guys I know this would be best in the plumbing forum but i need some help with pricing so thought it best in the closed forum. Ive been asked to price for some new build houses, its for a builder i do work for not a big house building firm. ive just know idea what to put in. i know what i...
  16. C

    New Build - Lovely

    Nice to see TBOE making a return to get that extra % out of the rads but who on earth want's pipework like this ?:puke:
  17. Aquaplumber108

    Once and for all why you build TWO SEPARATE TAPS???

    Hi there guys, There are many jokes around internet about British taps, that instead of putting mixer you guys make two separate taps. Why the hell you do it? Explain it to the whole world were is the logic?From customers perspective of view that's very uneconomical, uncomfortable and not...
  18. D

    New Build Plumbing Help Please

    Hi All Looking for advice I'm at the plumbing stage now on a new selfbuild ( done/doing most of the work myself ). What i want to achive is the following: Wood Pellet Back Boiler : To supply all Hot water demands ( unless Gas mains supply comes 140mtr from main road ) UFH 3 zones: 1: Living...
  19. S

    Lead Valley in new build - opinions of pictures please

    Hello folks, I have registered here tonight to get some opinions on a plumbers work to valleys on front and rear of my new build. He has been back today to "fix it" but to me it still looks naff and I have insisted that a strong North Easterly gale in winter will cause a lot of water to run/jump...
  20. J

    Plumber(s) required for 3 house new build

    Looking for competent plumbers to price and work with the design of water/gas/waste plumbing for a terrace of 3 houses in Surrey. UFH manifolds and pipework will be installed by others - feeds to manifolds part of the job though. 3 kitchens 3 cloakrooms 8 bathrooms 3 utilities Gas central...
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock