Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

No that’s not what I meant mutley.

multi- finish is the product name.

The usual method is to apply it in two layers, the second being applied whilst the first is still live - it’s getting the timing right that is the trick.
Same again in terms of timing for your final trowel up; too soon it all moves around too much and goes wavy; too late and .... well it’s too late!
 
No that’s not what I meant mutley.

multi- finish is the product name.

The usual method is to apply it in two layers, the second being applied whilst the first is still live - it’s getting the timing right that is the trick.
Same again in terms of timing for your final trowel up; too soon it all moves around too much and goes wavy; too late and .. we’ll it’s too late!

Ah I see Ben-Gee. But, you could keep adding coats on top until you get it to a level you are happy with hey?
 
Bathroom is coming together nicely 👍 kop.
 

Attachments

  • IMG_20200701_131508.jpg
    IMG_20200701_131508.jpg
    105.7 KB · Views: 29
  • IMG_20200701_131516.jpg
    IMG_20200701_131516.jpg
    75.6 KB · Views: 27
  • IMG_20200701_131525.jpg
    IMG_20200701_131525.jpg
    111.9 KB · Views: 22
  • IMG_20200701_151610.jpg
    IMG_20200701_151610.jpg
    113.3 KB · Views: 20
Nice. What's that onnthe floor under the tiles, levelling compound?
[automerge]1593622865[/automerge]
No that’s not what I meant mutley.

multi- finish is the product name.

The usual method is to apply it in two layers, the second being applied whilst the first is still live - it’s getting the timing right that is the trick.
Same again in terms of timing for your final trowel up; too soon it all moves around too much and goes wavy; too late and .. well it’s too late!

Easy to order a Marshalltownntrowel but getting hold of some finish plaster....in my dreams. Bought a bag of lime and a couple of bags of sand so going to have a go on my garage wall this weekend.
 
Will look nice once complete mate. Pop a few more up once done. You tilling underneath or around the toilet?
Yes mate will do, its the old toilet H i will pull it out tomorrow and lay the rest of the floor with quick set , before installing the bathroom units and sanitary ware.
[automerge]1593628376[/automerge]
Yes Mutley its levelling compound topps fast track stuff goes off quickly and leaves a hard clean surface to tile onto prime with sbr the old floor and before levelling, and again before tiling i couldn't build it up to much nearer to the doorway . Kop
[automerge]1593631525[/automerge]
Looks nice but them floor tiles will be a bit slick with water on them.

Really like the grey wall tiles.
Not that bad bud
 

Attachments

  • Screenshot_20200701-191819_Chrome.jpg
    Screenshot_20200701-191819_Chrome.jpg
    78.9 KB · Views: 16
  • Screenshot_20200701-194221_Photos.jpg
    Screenshot_20200701-194221_Photos.jpg
    53.1 KB · Views: 19
Last edited:
It’s decent stuff but need to prime the floor first

use it to fit a range cooker where the cus didn’t have any more tiles went off like a rocket and hard
 
Three hours to fit an outside tap on a new build this morning, I had a nightmare!
Hardly any space between fittings and the shelf wouldn’t come out. Tightening up the isolation valve and the two soldered tees straight after the stop tap came apart. They were butted together and no solder inside either fitting! Just the lip of either tee.
Easiest £60 I ever made 😅
FBCF3F42-8143-4595-A902-F03BAC09D877.jpeg
 
Three hours to fit an outside tap on a new build this morning, I had a nightmare!
Hardly any space between fittings and the shelf wouldn’t come out. Tightening up the isolation valve and the two soldered tees straight after the stop tap came apart. They were butted together and no solder inside either fitting! Just the lip of either tee.
Easiest £60 I ever made 😅
View attachment 44425
Ugh, I feel for you. I have been there many of times.
 
It should still be a set standard though mate. I want to know who signs this stuff off before the plasterboard goes up and is skimmed.

I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
 
I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
I see it all the time mate. My estate is a new build and there is loads of others by where I live.
 

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock