Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Hi KOP, I was told by aqualisa that a flow limiter can damage the pump so could only go down to 10l/min (if I remember correctly) - what do you go down to and have you had any problems?
I too have wanted to hold the bugger back occasionally!
 
Hi KOP, I was told by aqualisa that a flow limiter can damage the pump so could only go down to 10l/min (if I remember correctly) - what do you go down to and have you had any problems?
I too have wanted to hold the bugger back occasionally!
9 litres a minute bud I will contact Aqualisa and check ? after second thoughts I may adjust where I limited the flow to the incoming supplies that way theres no back pressure , the stainless steel grate is the problem luckily my brother is the production manager in a factory that produces sheet metal products so hes going to fabricate a new one with 40 more holes in then restriction can come out ??? cheers Kop
 
You’ll probably have a market for those grids! I find positioning the riser rail/fixed head makes a hell of a difference to waste removal - but of course this has to be run past customer, if it wasn’t for them this job would be easy.
 
Update chaps after talking to Aqualisa technical , I have adjusted the processor control unit to HP eco mode from combi mode this reduces the flow by 2 litres a minute and removed the flow limiter it is not guaranteed to work faultlessly and can fluctuate slightly on temperature but a 2 litres a minute saving is worth trying also getting a grate made with 40 extra holes so should help. Kop
 

Attachments

  • IMG_20200618_113022.jpg
    IMG_20200618_113022.jpg
    151 KB · Views: 12
  • IMG_20200618_104935.jpg
    IMG_20200618_104935.jpg
    180.4 KB · Views: 17
  • Screenshot_20200618-183059.png
    Screenshot_20200618-183059.png
    95.6 KB · Views: 12
Started a bathroom upgrade this week new owner hates the assisted bathroom look and it's fixtures and fittings so a full strip and new tiling is taking place, updating everything . Kop
 

Attachments

  • MVIMG_20200622_085813.jpg
    MVIMG_20200622_085813.jpg
    127.8 KB · Views: 8
  • IMG_20200622_085827.jpg
    IMG_20200622_085827.jpg
    68.6 KB · Views: 8
  • MVIMG_20200623_100728.jpg
    MVIMG_20200623_100728.jpg
    122.2 KB · Views: 11
  • IMG_20200623_100732.jpg
    IMG_20200623_100732.jpg
    144.7 KB · Views: 9
  • IMG_20200623_100739.jpg
    IMG_20200623_100739.jpg
    103.5 KB · Views: 11
Looks good Scott you do the prep eg hardie ? And Mira shower ?
 
I hate bathrooms 😄
This is the tray I asked for advice on another thread. Went for SBR and flexible tile adhesive in the end.
View attachment 44319View attachment 44320
Looks tidy Scott 👍 sorry bud must of missed that one I would have done the same . What were the wall panels made of ???? Kop
[automerge]1593064039[/automerge]
Got a few tiles up it all taking shape nicely . Kop
 

Attachments

  • IMG_20200624_164605.jpg
    IMG_20200624_164605.jpg
    81.3 KB · Views: 13
  • IMG_20200624_164553.jpg
    IMG_20200624_164553.jpg
    126.9 KB · Views: 14
Last edited:
To frigging hot today so sacked off the bathroom job come 1 o'clock and fixed a Baxi duo tec for a mate .
 

Attachments

  • IMG_20200626_091718.jpg
    IMG_20200626_091718.jpg
    114.3 KB · Views: 10
  • IMG_20200626_100901.jpg
    IMG_20200626_100901.jpg
    123.8 KB · Views: 14

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top