Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,158
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 114
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Finishing stripping out and draining down 4 rads only problem was had to drain the entire system total was around 55-60 rads
 

Attachments

  • FF5AE28F-B033-4C00-92A1-9F01C96BC18B.jpeg
    FF5AE28F-B033-4C00-92A1-9F01C96BC18B.jpeg
    134.4 KB · Views: 20
  • C3D572B9-DE3F-4582-A293-CBF55352BEEC.jpeg
    C3D572B9-DE3F-4582-A293-CBF55352BEEC.jpeg
    106.4 KB · Views: 21
Wish my day was as simple. The floor is rotten on my job as well, (sheet boarding). Always the way when you could do with the job going smoothly. Is that Hardi on the floor shaun?

yes mate but not installed correctly for my liking (tilers installed it)

should be glued to the floor with either mi approved foam or tile addy

its all plastic so install isnt the best

would love something to get my teeth in atm but flip side back to site tomorrow so should be happy
 
yes mate but not installed correctly for my liking (tilers installed it)

should be glued to the floor with either mi approved foam or tile addy

its all plastic so install isnt the best

would love something to get my teeth in atm but flip side back to site tomorrow so should be happy
Thin layer of tile adhesive then screwed for me mate. How did they do it?
 
Thin layer of tile adhesive then screwed for me mate. How did they do it?

yep me also but for them straight onto the boards and screwed them down
 
Finished off another flat
 

Attachments

  • A0893B8F-1237-4A54-B649-496AAEADB479.jpeg
    A0893B8F-1237-4A54-B649-496AAEADB479.jpeg
    71.5 KB · Views: 18
How does it perform?
12kw must be a bit poor on hot water

with only 6lpm yes tbh it’s close to unusable lucky client supplied then I quoted for 24kw lpg combis
 
New posts

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock