Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Got the boiler finished off today a little annoying I had to run a cable from the pump direct to the boiler for overun have a relaxing weekend chaps
 

Attachments

  • IMG_20220813_142817020.jpg
    IMG_20220813_142817020.jpg
    537.4 KB · Views: 35
  • IMG_20220813_142829344.jpg
    IMG_20220813_142829344.jpg
    489.7 KB · Views: 18
  • IMG_20220813_142934719.jpg
    IMG_20220813_142934719.jpg
    525.1 KB · Views: 21
  • IMG_20220813_123018706.jpg
    IMG_20220813_123018706.jpg
    496.8 KB · Views: 21
Just finished this off on Friday.
 

Attachments

  • 35BEE767-B068-499D-85AF-CC8FD35CC432.jpeg
    35BEE767-B068-499D-85AF-CC8FD35CC432.jpeg
    462 KB · Views: 23
  • 0194272D-C096-4129-A797-A4D0C7986258.jpeg
    0194272D-C096-4129-A797-A4D0C7986258.jpeg
    311.6 KB · Views: 24
  • 81BF1306-9D54-4E8B-AC36-C2D39AD3417D.jpeg
    81BF1306-9D54-4E8B-AC36-C2D39AD3417D.jpeg
    441 KB · Views: 24
  • 444B818B-08D0-48B2-ACE6-78E6BB3826ED.jpeg
    444B818B-08D0-48B2-ACE6-78E6BB3826ED.jpeg
    476.8 KB · Views: 27
  • 46533B23-8B3C-492A-A5C5-5868169817E6.jpeg
    46533B23-8B3C-492A-A5C5-5868169817E6.jpeg
    490.5 KB · Views: 34
Labour and supplying stuff and materials (Excluding Tiles, customer supplied) £9k inc VAT. Although really should have been a bit more, was quoted at our old labour prices.

Although there was very little electrical works on this one, plus everything basically stopped in the same place.

Floor was a mess underneath so was another £250 on top of above for redoing floor too.
 
Looks good mate. 7 year warranty? Did you mould the probe yourself or buy it that shape😂

Yes and out of necessity (bloody kitchen fitters was before the flexi probe came out) they keep getting flagged by Kane but keep passing :D
 
Viessman 222- f - 1 year down the line time to service this ready for winter hasn't been any trouble but not the most enjoyable task everything is so awkward maybe it will be easier next time . Kop
 

Attachments

  • IMG_20220908_102724158_HDR.jpg
    IMG_20220908_102724158_HDR.jpg
    275.1 KB · Views: 18
  • IMG_20220908_102741103_HDR.jpg
    IMG_20220908_102741103_HDR.jpg
    261.6 KB · Views: 16
  • IMG_20220908_104027246_MFNR.jpg
    IMG_20220908_104027246_MFNR.jpg
    375.7 KB · Views: 18
  • IMG_20220908_112420513_HDR.jpg
    IMG_20220908_112420513_HDR.jpg
    356.3 KB · Views: 19
  • IMG_20220908_115235644_MFNR.jpg
    IMG_20220908_115235644_MFNR.jpg
    301.9 KB · Views: 18
After a run of bathrooms been having a run of Combi conversions getting fewer conversions these days now though.
 

Attachments

  • EA4CCD85-55F3-4834-B13E-525C13FF9E1C.jpeg
    EA4CCD85-55F3-4834-B13E-525C13FF9E1C.jpeg
    384.8 KB · Views: 17
  • 688DC402-041F-49D4-842F-7E02A9B982A4.jpeg
    688DC402-041F-49D4-842F-7E02A9B982A4.jpeg
    341 KB · Views: 17
  • 2ADFC7EF-73D4-41BD-94B0-CBD53B8F2CAC.jpeg
    2ADFC7EF-73D4-41BD-94B0-CBD53B8F2CAC.jpeg
    405.1 KB · Views: 17
  • 57277829-DC04-49C9-BDBA-A56B24ACCBEC.jpeg
    57277829-DC04-49C9-BDBA-A56B24ACCBEC.jpeg
    315.8 KB · Views: 17
Had to swap this (pipework was originally right of the cylinder but spark said no)
 

Attachments

  • 15C3B6C3-662A-4ED7-A064-9D97456681E6.png
    15C3B6C3-662A-4ED7-A064-9D97456681E6.png
    1.4 MB · Views: 20
Why? Can't see any immediate reason 🤔

He said he can’t have any water pipes close to the consumer unit incase the burst and flood/ wet the board 🤔

New one on me
 

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock