B
Billy Bob Bob
LP722 7 day programmer Drayton, Invensys. Heating & Hot water Timer | eBaythis will cover both fully pumped and gravity domestics Steve
Discuss thorn apollo timer needed in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We know that I was wanting to find out what the system installed was and could adviseif he gets a drayton lp series clock its suitable for both,you just position a link on the back to fp or gp
we dont know yet steves not told us if its s plan,y plan or pumped heating and gravity domestics i carry the LP 2 channel in stock as it fits allWe know that I was wanting to find out what the system installed was and could advise
Keep ya hair onwe dont know yet steves not told us if its s plan,y plan or pumped heating and gravity domestics i carry the LP 2 channel in stock as it fits all
Keep ya hair on
tamz has narrowed it down
as i said there's two boilers this thorn and another one for the hot water i saw it last year when they moved in. if i recall correctly there is a pump under the thorn. the hot water boiler has replaced the cylinder i think it is a hot water only combi as there is only cwsc in loft.
Reply to thorn apollo timer needed in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.