hi all i have a job where the customer wants his bath taken out and replaced with a shower. job involves
take out old suite.
tray will need to be raised on concrete floor to allow for waste from bath. 1000 x 700 offset or rectangle tray
tile the enclosure then fit shower enclosure.
fit electric shower.
tile floor.
fit new basin.
fit new toilet.
he also wants a basin fitted in shed close to back of house. there is decking all the way to shed he only wants a cold feed and then waste run back under decking.
i usually fit a standard bathroom suite with bath basin and sink in couple of days. this is a lot more work and not sure how many days it will take.
what sort of time scale would you guys expect for completion thanks.
take out old suite.
tray will need to be raised on concrete floor to allow for waste from bath. 1000 x 700 offset or rectangle tray
tile the enclosure then fit shower enclosure.
fit electric shower.
tile floor.
fit new basin.
fit new toilet.
he also wants a basin fitted in shed close to back of house. there is decking all the way to shed he only wants a cold feed and then waste run back under decking.
i usually fit a standard bathroom suite with bath basin and sink in couple of days. this is a lot more work and not sure how many days it will take.
what sort of time scale would you guys expect for completion thanks.