Hi guys,

fitted a pcb cb to a Worcester 24si mk2. On checking the burner pressure it was to be 9.5 mbar, should be 12.1mbar. Tried to adjust it but wouldn't go adjust, checked working pressure at meter and was found to be 16mbar national grid came out, not governor but supply problem. National grid guy said at first he would leave everything on till they get a team out to rectify problem. Told him I had tried to adjust burner pressure on boiler so if they fix the pressure at the meter tomorrow, it will possibly impact the burner pressure at the boiler making it unsafe so would they check burner pressure on boiler once they are done.

guy just said he will have now have to AR boiler to cover his bum. Now where does that leave me because once they do the work, the burner pressure will need checking to make sure it's safe, is it my responsibility or theirselves??
 
Grid have someone qualified to do purge and relights.

cant see how they are allowed to increase the working pressure coming into the house without checking that the burner pressures on appliances are still within limits
 
As above Grid can do relights without actually checking appliances as such, Do ya know any other firm that's allowed to turn back on without certifying as safe. tis wrong i say.
 
when i had a boiler that was under pressured due to poor supply, they replaced the incoming pipework and moved the meter, repiped to the boiler and checked working pressures were safe at boiler before relighting. seems some areas follow the rules better than others, they all come under the same regs as us.
 
I'd say you need to return back. The fact you tried to adjust it and the meter was wrong means you did something wrong. Think MI state u should check inlet before adjustments are made. But I would also charge custard as even if you had checked then u would need an extra visit. Latent defect.. ÂŁÂŁÂŁÂŁ
 
I think that the boiler should be left isolated and tagged that it requires commissioning as it has been adjusted/tweaked whilst the supply was not optimal. It will require a revisit.
 
All depends on the guys!! I had a good chat with the guys when they came out to customers!! 3 out of 5 of the guys aren't qualified on gas!! They are just digging the hole and putting barriers out etc!! 1 of them is qualified on meters!! So does gas pipe and meters and nothing else!! To get a digger they must raise a ticket!! To get a gas engineer in they must raise a ticket!! To start work!! Raise a ticket!! To Finnish work,, raise a ticket!! So the less tickets they do the better!! The less work they have to do the better!! I got 3 free lengths of copper!! A handful of fittings and a load of washers free cos I helped them out!! So worth me helping!! If you are that worried, ask them to call you when nearly finished to check boiler!! They are helpful if you help them!!
 
I would say its your responsibly... As you adjusted the burner pressure before checking the inlet on the gas valve which would have shown you a problem etc...

its just one of those things! The customer will appreciate you checking the boiler after they've been & it gives ya peace of mind! Plus you can charge if you really want?
 
Status
Not open for further replies.

Reply to National grid - who's responsible me or them?? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi all, a little advice and validation of current advice (from dad). So boiler has been loosing pressure with an error code of E119. The pressure...
Replies
11
Views
2K
  • Locked
Went to service a boiler today. First tests I do is tightness/letby and then working pressure at meter and inlet on gas valve. I was getting...
Replies
61
Views
519
A number of issues have been raised from a boiler replacement. Boiler not operating and with no pressure. Tile damage Sprawling pipe layout in...
Replies
21
Views
5K
  • Locked
I have my initial gas safe inspection coming up after successfully completing my ACS a few weeks ago - and, it's fair to say i'm slightly nervous...
Replies
10
Views
4K
  • Locked
About a year ago I had a a big renovation done (using professionals) and this included new central heating, plumbing and bathroom. 2 jobs I had...
Replies
13
Views
2K
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock