Yes, repeat, at the lowest point in the new pipework, as existing.
As you would have found out if they weren't there, it's a lot of messing about with rags, containers and or wet vacs to drain down otherwise.
When you decide the location of the new drain offs, make sure you can get to them when the pipework is finished and any cupbaord boxing in is not in the way.