Discuss How to prevent chamber blocking in the UK Plumbers Forums area at PlumbersForums.net

Messages
4
After some advice please, my waste chamber clogs up about once a month, please see picture.

i put the chamber there because the pipe turns 90 degrees right under the new extension also there's another pipe to the rain water down pipe.

Please help do it need to move the chamber? And where?
 
Picture of the layout please advise
 

Attachments

  • 20230502_191410.jpg
    20230502_191410.jpg
    513.2 KB · Views: 20
What clogs the smaller waste what goes into the closest one or the far manhole ?
 
In my opinion the manhole is to close to the
extension waste solids will be traveling a quite a rate through that soil pipe a nice slow sweeping bend at the base of the soil stack then into at least 1.5 m of straight pipe before entering the manhole to slow down the splatter effect of solids and toilet paper this is what your experiencing causing blockage rodding access is a must aswell at it base of the soil stack . Kop
 

Reply to How to prevent chamber blocking in the UK Plumbers Forums area at PlumbersForums.net

Newest Plumbing Threads

Back
Top