Search the forum,

Discuss here's on for you....... in the USA area at PlumbersForums.net

Messages
32
Job im pricing up , picture it, big house currently has 2 bathrooms downstairs, a 35kw Combi in,
pricing up to put 7 ensuites in (existing bathrooms staying as are), 2 are located on ground floor and the other 5 are upstairs.
There is no loft space. The incoming supply at the moment is 1/2'.
The ensuites will consist of basin, bar shower and toilet.
Due to the location of the property, (a cemetery believe it or not!) we can't dig up and run new bigger MDPE supply in.
So I was thinking of leaving the combis to supply the bathrooms downstairs and then for the ensuites I was thinking direct cylinder with cws tank. But then its the height for the tank, we don't have it! the ceiling is basically just the roof.
So then I was thinking a tank stored at a low level possibly the ground floor where there is more room and then pumped.
We don't want to fit electric shower as only single phase.
Anyone recommend a particular system or way which might be best? any help appreciated

cheers
 
Could you mole a new main in or pull one in through the old main ?

If you can could you put a shed up and put a break tank and pump in there ?
 
Could you mole a new main in or pull one in through the old main ?

If you can could you put a shed up and put a break tank and pump in there ?
[/QUOTE
Could you mole a new main in or pull one in through the old main ?

If you can could you put a shed up and put a break tank and pump in there ?


Hi Shaun,

The building is grade 2 listed, we can't put a shed up unfortunately. But we do have a massive kitchen that we can build a separate cupboard space to house it
 
Hi Shaun,

The building is grade 2 listed, we can't put a shed up unfortunately. But we do have a massive kitchen that we can build a separate cupboard space to house it

have a look at the dab system
 
What’s the mains flow like as it might be worth getting the extra tank if it’s bad
 
What's your indemnity insurance like?

You dont want to install something that wont work. As a minimum I would want an upgrade of the mains.
 
Are you adding 7 ensuites?

If so, I would be specifying water mains size required and getting the owner of the property to provide that through their water company.

You need to cover yourself, because you will be the one responsible & liable, if things don't work as they should after the works have been completed
 
Not rated for constant demand normally 15mins on an hour off
 

Reply to here's on for you....... in the USA area at PlumbersForums.net

Similar plumbing topics

Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
316
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
420
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock