build

Design–build (or design/build, and abbreviated D–B or D/B accordingly) is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It can be subdivided into architect-led design–build (ALDB, sometimes known as designer-led design–build) and contractor-led design–build.
In contrast to "design–bid–build" (or "design–tender"), design–build relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.
Design-build also has a single point responsibility. The design-build contractor is responsible for all work on the project, so the client can seek legal remedies for any fault from one party.The traditional approach for construction projects consists of the appointment of a designer on one side, and the appointment of a contractor on the other side. The design–build procurement route changes the traditional sequence of work. It answers the client's wishes for a single point of responsibility in an attempt to reduce risks and overall costs. It is now commonly used in many countries and forms of contracts are widely available.
Design–build is sometimes compared to the "master builder" approach, one of the oldest forms of construction procedure. Comparing design–build to the traditional method of procurement, the authors of Design-build Contracting Handbook noted that: "from a historical perspective the so-called traditional approach is actually a very recent concept, only being in use approximately 150 years. In contrast, the design–build concept—also known as the "master builder" concept—has been reported as being in use for over four millennia."Although the Design-Build Institute of America (DBIA) takes the position that design–build can be led by a contractor, a designer, a developer or a joint venture, as long as a design–build entity holds a single contract for both design and construction, some architects have suggested that architect-led design–build is a specific approach to design–build.
Design-build plays an important role in pedagogy, both at universities and in independently organised events such as Rural Studio or ArchiCamp.

View More On Wikipedia.org
  1. R

    pressure build up problems

    hi all, called to a boiler problem and discovered the filling loop was left connected to the boiler and the isolation valve was passing which in effect was causing the prv to open causing pressure loss and locking boiler out, in addition the expansion vessel req changing as had been damaged...
  2. V

    New Build - What system is best?

    Hi, I am having a new house built and am confused what is the best system for the house which does not cost an arm and leg. The house will have 4 bathrooms, 1 bath and 3 showers over 3 floors. Ground floor which is approx. 103sqm will have underfloor heating split into 5 zones. If 2 people are...
  3. T

    gas engineer as a career

    Hi everyone, I am new to this forum and to this idea to learn to be gas safe. How good is this idea to pay lot of fees to these private institutions and try to enter in land of unknown. Please advice.
  4. A

    Odd jobs to build confidence

    Hi guys, Seeing as i'm still in the army and working full time i have delayed looking to gain experience with a plumber in my free time as I could be told short notice i'm working weekends etc and don't want to let anyone down. What I was thinking i could do was do small jobs in the...
  5. A

    odd jobs to build confidence

    Hi guys, Seeing as i'm still in the army and working full time i have delayed looking to gain experience with a plumber in my free time as I could be told short notice i'm working weekends etc and don't want to let anyone down. What I was thinking i could do was do small jobs in the...
  6. P

    New build drain test problem

    I'm a first (and only!) time self builder so apologies if my limited background gives me away. I am at the point where our build is ready for the final drains test and there is a problem. I have a downstairs WC and shower room. Our plumber has run the shower and basin drains to the adjacent...
  7. R

    gas reg arguments in council housing

    i keep coming up with this recently in nottingham. get a call for cooker installations, when i go to view i find a particular housing association new builds have incorrect gas piping to cooker points. i.e. low to the floor 6 inches off, terminate in the middle of cooker opening, terminate 1...
  8. Q

    Your help please!!!!

    Any gas engineers out there in the walsall/ brum area willing to help me build my portfolio. I have my own tools and van and willing to work with anyone for free in order to build my portfolio. Completed training in July but family circumstances meant I had to put it on hold and lost my...
  9. Q

    Gas engineers...walsall/brum...help

    Any gas engineers out there in the walsall/ brum area willing to help me build my portfolio. I have my own tools and van and willing to work with anyone for free in order to build my portfolio. Completed training in July but family circumstances meant I had to put it on hold and lost my mentor...
  10. cr0ft

    New Build Cost of UFH (Plumbed Not Electric) Vs Typical Radiator System

    Hi all, We're hopefully about to complete on a 4 bed house today (105sq m over two floors). It's a new build at the early stages of the build, i.e. brickwork completed up to the first floor. I'm considering asking the builder to change the standard unvented cylinder for a twin coil one to...
  11. B

    W Bosch Greenstar 28i _pressure build, then dump

    Hi all, I have a 4yr old worcester bosch greenstar 28i combi boiler. The prv keeps kicking in and discharging water. When I first noticed this, I repressurised and bled the system to 2 bar, fired up the heating again and left if to heat up. Within an hour or so the water was dumped and pressure...
  12. G

    New builds

    Dont know if someone was spinning me a yearn today but they were saying alot of new builds now are not being built for use with gas , i know alot of flats are now none gas but houses??? He was saying that now they are moving to air source and within 10 years all gas will be none existant on any...
  13. S

    new build

    just had a look on gumtree and got my self some contract work on new build in west london ! start next week ! price work -bathroom 2 fix £25 per item -bath/basin /toilet=£75.00 boilers second fix £90 pre plumb unvented - £100 rad -£10 omg times are really not good at all !!! what do you guys...
  14. B

    build a new manhole for extension?

    Hi guys, I am doing some small jobs for a just finished extension, it is a new bedroom with ensuite, the builder said they must dig a new manhole for the new shower room, is this based on new regs? cheers
  15. R

    If you could build your own boiler

    Bit of whimsey....but if you could take all the boilers on the market and take the best bits and build your own, what would those parts be from which boilers? or expand and make your own parts too.
  16. S

    Is anybody on new build contract work at present?

    Hi, Is anybody on new build contract work at present and the contractor is looking for subbys? Time to go back on site! ouch.............
  17. P

    Help please with New Build project

    Hi all I am a Registered Plumber, Gas-Safe registered, and have unvented certificate. I normally work on extensions & refurbishments, but its a long time since I did my plumbing C&G, and (shame on me !!) I don't feel fully conversant with all the latest Regs. I am starting work on a new build...
  18. S

    lime scale build up in copper pipes

    My customer told me that his pipe work are blocked up with lime scale and he want me to install a new water softener on the system. As far as i understand the filter will treat the incoming water but will it help to clear the lime scale buildup in the pipes already?
  19. S

    kitchen sink waste pipe size

    Hi all, Got a dishwasher, wash machine and sink waste dropping directly into 110 soil drain, should i b using 2inch pipe for such a small run or will 1.5inch be ok?
  20. J

    looking at going into sub contracting

    hey hows it going. I recently thought about going into sub contracting. for the past 8 years iv worked for some one else and figure its time to move on. im happy to work all around the uk. would prefere working in a northern city/town and get into a building site where I can do the same thing...