Currently reading:
What we all working on this week ?

Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,158
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 114
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Squeezed a combi upgrade in with the boy Friday I must be getting old there taking a extra day now 😂😂am I worried nah 😂 9 pairs of rad valves changed , Valliant combi out , Ideal vogue in all working although I am gonna add 5 m of 28 from the meter , another flush add inhibitor and paperwork to complete . Cheers kop
 

Attachments

  • Screenshot_20210801-073549.jpg
    Screenshot_20210801-073549.jpg
    333.2 KB · Views: 25
  • PXL_20210731_110808321.jpg
    PXL_20210731_110808321.jpg
    722.5 KB · Views: 21
  • Screenshot_20210801-075634_Photos.jpg
    Screenshot_20210801-075634_Photos.jpg
    177.3 KB · Views: 20
Finishing this off think the timer was Soded again or doesn’t know how to sl
 

Attachments

  • 89BA5E6A-AABC-4111-B69B-6E24A64F9187.jpeg
    89BA5E6A-AABC-4111-B69B-6E24A64F9187.jpeg
    291.8 KB · Views: 17
  • ADD2F8B1-C3F0-4B66-97D0-D4B986684401.jpeg
    ADD2F8B1-C3F0-4B66-97D0-D4B986684401.jpeg
    557.3 KB · Views: 19
I’m on this. Can say it’s probably been the most awkward I have done
 

Attachments

  • 6EDA89C4-D8D2-42FF-A4B2-49B8AB6F98FC.jpeg
    6EDA89C4-D8D2-42FF-A4B2-49B8AB6F98FC.jpeg
    443.7 KB · Views: 18
  • 28A91A90-91FF-4335-8567-720547E72091.jpeg
    28A91A90-91FF-4335-8567-720547E72091.jpeg
    471.2 KB · Views: 17
  • 14F83F0E-CC28-4F8E-9EF2-D8DA7A1BD0F2.jpeg
    14F83F0E-CC28-4F8E-9EF2-D8DA7A1BD0F2.jpeg
    469.4 KB · Views: 20
Nice work chaps looking good, i've got 3 more to do and then I'm thinking of not doing anymore, they just take to long to complete and are working out quite expensive as a consequence, I'm falling behind on boiler and heating work which is better paid and quicker to turn over I think I'll take a step back from bathrooms for a while . Cheers kop
 
Looking at 3 on Sunday afternoon. But agree they seem to be taking longer to do.

It’s when everything is hidden away it all takes longer, used to just cut two notches in bath panel and run pipes to basin- can’t imagine doing that now!
Also wall hung toilet - frame, boxing, hardibacker, tiles, often built in shelving etc - 3 days or more. Just whack in a close coupled an hour or so.
 
It’s when everything is hidden away it all takes longer, used to just cut two notches in bath panel and run pipes to basin- can’t imagine doing that now!
Also wall hung toilet - frame, boxing, hardibacker, tiles, often built in shelving etc - 3 days or more. Just whack in a close coupled an hour or so.

I’ve got this atm they don’t like the mcalpine trap on the bath and the legs that came with the bath they supplied (old style plastic cast iron roll)
 
Servicing today Worcester CDI classic fully stripped and cleaned still in good condition, Alpha Intex 24 needed a new PCB was playing up E37 and E43 wouldn't reset scorching on the facia tell tale transformer problem stripped serviced cleaned replaced the board reset the parameters alls good . Kop
 

Attachments

  • PXL_20210818_083144363.jpg
    PXL_20210818_083144363.jpg
    460 KB · Views: 30
  • PXL_20210818_110450585.jpg
    PXL_20210818_110450585.jpg
    487.2 KB · Views: 18
  • PXL_20210818_111904043.jpg
    PXL_20210818_111904043.jpg
    450.5 KB · Views: 11
  • PXL_20210818_134605776.jpg
    PXL_20210818_134605776.jpg
    460.8 KB · Views: 10
  • PXL_20210818_110105435.jpg
    PXL_20210818_110105435.jpg
    240.6 KB · Views: 9
  • PXL_20210818_113456078.jpg
    PXL_20210818_113456078.jpg
    499.5 KB · Views: 10
  • PXL_20210818_120822872.jpg
    PXL_20210818_120822872.jpg
    264.4 KB · Views: 9
  • PXL_20210818_082138215.jpg
    PXL_20210818_082138215.jpg
    464.2 KB · Views: 9
  • PXL_20210818_084452384.jpg
    PXL_20210818_084452384.jpg
    411.9 KB · Views: 19
Last edited:
Tiling this week and next, floors for a change. 13 sqm of 600 x 600 porcelain to start, then onto a 3 part Victorian look alike through the rest of the kitchen and up the hallway.
Day off it tomorrow to fit an oil combi.

Roll on 10th September, week away to Marton Mere in Blackpool with wife and granddaughter.
Ready for some down time.
 
Tiling this week and next, floors for a change. 13 sqm of 600 x 600 porcelain to start, then onto a 3 part Victorian look alike through the rest of the kitchen and up the hallway.
Day off it tomorrow to fit an oil combi.

Roll on 10th September, week away to Marton Mere in Blackpool with wife and granddaughter.
Ready for some down time.
Mind your knees 😉
 
What’s wrong with the tap can’t tell most clients

Also first fix an toilet and basin
 

Attachments

  • FA8F8AA8-C5B5-484B-B380-87571620E219.jpeg
    FA8F8AA8-C5B5-484B-B380-87571620E219.jpeg
    342.3 KB · Views: 15
  • 8D17AAAC-9875-4AD1-8310-29DD12B26ECC.jpeg
    8D17AAAC-9875-4AD1-8310-29DD12B26ECC.jpeg
    316 KB · Views: 17
  • 0BA27CFD-1831-4306-9464-DFE12483E7BD.jpeg
    0BA27CFD-1831-4306-9464-DFE12483E7BD.jpeg
    389.3 KB · Views: 18
  • 9E2C476F-17FD-4456-882A-9F84AA6A7FC4.jpeg
    9E2C476F-17FD-4456-882A-9F84AA6A7FC4.jpeg
    218.7 KB · Views: 19

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock