Currently reading:
PRV question ..................

Discuss PRV question .................. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

Robert Tyrrell

Gas Engineer
Messages
701
Just a quick one really - I've noticed a couple of the boilers I've been servicing have the pipe from the PRV running in 15mm copper for a short run and then they exit into a 32mm plastic waste pipe. I've also seen this on a new installation as well.
I thought that it had to be in copper all the way - or am I wrong?
 
Needs to be pushfit waste pipe and trapped

Also need a tundish on the prv pipe out the boiler
 
So does that mean that solvent weld waste pipe has a lower tolerance, and if so how would anyone know which pipe has been used once it's installed?

Yes correct and you need to stub it above so you can tell
 
Status
Not open for further replies.

Reply to PRV question .................. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock