I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 116
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Just had three days converting gravity hot to unvented in a bungalow, plus re routing all pipes in roof space ready for a loft conversion next year.
Had to move feed and expansion for heating and get it all up and running today. Left at 8.00 tonight.
50 minutes later, text message, water bubbling up through kitchen floor.
The only section of hot pipe in the concrete floor runs from under the bath and across kitchen floor to sink, and it's gone pop.

Only thing I could do tonight was turn off hot water.

But now have to fit in pulling up a real wooden floor and digging out concrete to fix the leak.

Not like I'm busy or anything. Ffs.
Its always a risk converting to pressurised Simon I hope you covered yourself before hand mate ? Can you reroute rather than dig up and look for leaks ?? Chances are it may find the next weakness point and leak there ?? Feel for you mate. Regards kop
 
Last edited:
Its always a risk converting to pressurised Simon I hope you covered yourself before hand mate ? Can you reroute rather than dig up and look for leaks ?? Chances are it may find the next weakness point and leak there ?? Feel for you mate. Regards kop

All explained to customer beforehand, plus covered in estimate.

No chance to reroute, unfortunately, but had the plinth off under sink unit and it looks like a previous repair was done and I reckon it's the repair that's failed 🤞🤞
 
Converting a bathroom to have a walk in shower stripped out and starting the rebuild, got the Flova smartbox fitted and piped a bit tricky in a metal stud wall pipes passing through the metal uprights but have sleeved them all . Kop
 

Attachments

  • IMG_20221012_160901417_MFNR.jpg
    IMG_20221012_160901417_MFNR.jpg
    448.2 KB · Views: 21
  • IMG_20221012_172823385_MFNR.jpg
    IMG_20221012_172823385_MFNR.jpg
    336.5 KB · Views: 20
  • IMG_20221012_172840055_MFNR.jpg
    IMG_20221012_172840055_MFNR.jpg
    414.6 KB · Views: 20
  • IMG_20221012_131351465_MFNR.jpg
    IMG_20221012_131351465_MFNR.jpg
    434.9 KB · Views: 23
Converting a bathroom to have a walk in shower stripped out and starting the rebuild, got the Flova smartbox fitted and piped a bit tricky in a metal stud wall pipes passing through the metal uprights but have sleeved them all . Kop
You are brave taking them pipes across like that. One day someone will go straight through them putting a grab rail up or something and wished they'd never started 😂 Know it can't be helped sometimes.
 
That gonna be a wallboard job kop? Then at least you don’t have to try and make good that awful metal stud wall - just go over the gaps 🙂.
Have you used flova before, any good?
Not on this one mate going to be tiled all quality stuff on this Flova shower and fixtures and fitting in bronze, 1700 x 800 slab tray that's gonna hurt 😂 10 mm frosted glass panel should look good . 👍
 

Attachments

  • Screenshot_20221012-092027.png
    Screenshot_20221012-092027.png
    125.5 KB · Views: 16
Last edited:
On with this at the minute, they’ve lived there 55 years and never touched the bathroom. Awkward room for a layout, so done some shifting about.
 

Attachments

  • C82EA218-25AD-4E66-9377-6C42BE2A295C.jpeg
    C82EA218-25AD-4E66-9377-6C42BE2A295C.jpeg
    466.5 KB · Views: 21
  • 7422DFBD-D233-4A1B-841F-9E59E8576263.jpeg
    7422DFBD-D233-4A1B-841F-9E59E8576263.jpeg
    581.1 KB · Views: 19
  • D520408D-5C64-44A0-A69B-DB43971481E1.jpeg
    D520408D-5C64-44A0-A69B-DB43971481E1.jpeg
    514.7 KB · Views: 22
  • EECD3CAF-93A0-4D52-82A5-71E16FB8E2E4.jpeg
    EECD3CAF-93A0-4D52-82A5-71E16FB8E2E4.jpeg
    446.7 KB · Views: 23
Cracking on need to get this tiled today clients are home from the USA at the weekend, all going well but lost 2 days last week on another job so I'm playing catch up 😉👍
 

Attachments

  • IMG_20221019_173100760_MFNR.jpg
    IMG_20221019_173100760_MFNR.jpg
    312.8 KB · Views: 15
  • IMG_20221019_173051315_MFNR.jpg
    IMG_20221019_173051315_MFNR.jpg
    421.6 KB · Views: 17
  • IMG_20221019_173112283_MFNR.jpg
    IMG_20221019_173112283_MFNR.jpg
    398.4 KB · Views: 15
The guys a estimator for a roofing company so should have done better I can get the shower done just about a few tiles missing at high level 🤞. Kop
 

Attachments

  • IMG_20221020_175409010_MFNR.jpg
    IMG_20221020_175409010_MFNR.jpg
    366.9 KB · Views: 16
  • IMG_20221020_175429564_MFNR.jpg
    IMG_20221020_175429564_MFNR.jpg
    145 KB · Views: 15
Just finished this in time for the weekend. Roll on Monday and another job 😂
 

Attachments

  • 09F8E8C7-61CC-4234-A30B-B3A8A19C1594.jpeg
    09F8E8C7-61CC-4234-A30B-B3A8A19C1594.jpeg
    650.6 KB · Views: 10
  • BAD6D602-2015-4EFC-9C71-672EFB90F04F.jpeg
    BAD6D602-2015-4EFC-9C71-672EFB90F04F.jpeg
    580.3 KB · Views: 12
  • D0D8AB19-087A-4AF9-A5CB-1394047A0D85.jpeg
    D0D8AB19-087A-4AF9-A5CB-1394047A0D85.jpeg
    528.3 KB · Views: 11
  • E80BA124-3EB1-4C84-8FA8-02577C0FEFE2.jpeg
    E80BA124-3EB1-4C84-8FA8-02577C0FEFE2.jpeg
    450.8 KB · Views: 11
  • 2E6F39F9-F06C-4C9D-B530-433192E171BA.jpeg
    2E6F39F9-F06C-4C9D-B530-433192E171BA.jpeg
    529.7 KB · Views: 15
  • FD2CB44C-BC93-4109-B622-16B5EB7EA6D1.jpeg
    FD2CB44C-BC93-4109-B622-16B5EB7EA6D1.jpeg
    600.4 KB · Views: 19
Managed to squeeze in a ho that was a sod to vent
 

Attachments

  • 876BB43A-1431-47F3-8046-6F542791FF83.jpeg
    876BB43A-1431-47F3-8046-6F542791FF83.jpeg
    343.9 KB · Views: 15
Got the glass fitted and shower working wouldn't of been my choice but customers liked it in the showroom it masks the expensive fixtures and fittings and closes the room in ? , they arrive home today after 2 weeks in the USA so time will tell 🫣. Kop
 

Attachments

  • IMG_20221022_110218443_MFNR.jpg
    IMG_20221022_110218443_MFNR.jpg