Currently reading:
What we all working on this week ?

Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,158
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 116
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Viessman 222- f - 1 year down the line time to service this ready for winter hasn't been any trouble but not the most enjoyable task everything is so awkward maybe it will be easier next time . Kop
Looks an awkward one, I'll not be fitting any of those 🤣
Wasn't a easy install and definitely a pita to service but their bills are lower and weather compensation has worked well the customer is tec savy so no worries with the app . Kop
 
Can’t decide which boiler you like??? 😅
Use Main as our budget boiler - cracking for money.
Vaillant is our go to ‘Premium’ brand. The Worcester one I’d offered them two options Worcester and Vaillant. Worked in my favour for as could run pipes down back.

The Pro is a solid boiler though. Be sad to see it go when it does. Vaillant are just a bit behind with their modulation etc. as new model has been delayed.
 
Even though I don’t know what I’m doing from one week to the next, it‘s still all similar and mundane. Gas safety checks, occasional boiler fault, and installing some thermostats. Friday was most exciting day when I got to change some wiring going into a programmer, that I think was just being used as a junction box.
 
Home for next 4 days, couple little bits for friday, postpone bowes from monday and salou on Tuesday for a week.
 

Attachments

  • 20220912_085036.jpg
    20220912_085036.jpg
    280.7 KB · Views: 14
  • 20220912_085033.jpg
    20220912_085033.jpg
    323.3 KB · Views: 16
  • 20220912_085020.jpg
    20220912_085020.jpg
    298.6 KB · Views: 19
  • 20220912_085016.jpg
    20220912_085016.jpg
    364.5 KB · Views: 21
What do you do about backflow prevention on the shower hose? Only way I was able to do it on level access showers was a chrome school board clip, or in some instances a shorter hose.

Adjust and fix the soap dish so the head doesn’t go below spill over
 
Working on 2 ensuite bathrooms on this period cottage drainage is proving a challenge alot of alterations to do and new pipe runs to install alot through triple joists ☹️. Kop
 

Attachments

  • Screenshot_20220920-070748.png
    Screenshot_20220920-070748.png
    1.1 MB · Views: 18
  • Screenshot_20220920-070954.png
    Screenshot_20220920-070954.png
    793.3 KB · Views: 17
  • Screenshot_20220920-071012.png
    Screenshot_20220920-071012.png
    799.9 KB · Views: 17
  • Screenshot_20220920-071026.png
    Screenshot_20220920-071026.png
    679.1 KB · Views: 18
  • Screenshot_20220920-070721.png
    Screenshot_20220920-070721.png
    793.6 KB · Views: 18
Yes Shaun they are ok mate middle of the road quality wise what you after ? Size and shape ??

Just a stnd pivot alcove eg between two walls around a hun cheaper than my normal supplier
 
One for @Murdoch

8.5kw shower and someone’s extended the wiring
 

Attachments

  • 43F664AE-15E2-4427-945A-BA52DA093521.jpeg
    43F664AE-15E2-4427-945A-BA52DA093521.jpeg
    402.2 KB · Views: 39
  • 4861BE13-C38B-44A5-99C6-4FD74C6B1674.jpeg
    4861BE13-C38B-44A5-99C6-4FD74C6B1674.jpeg
    384.2 KB · Views: 27
Installing 8 rads in doctors offices
 

Attachments

  • 6EE4493A-3D30-415F-8262-3BAA11714F07.jpeg
    6EE4493A-3D30-415F-8262-3BAA11714F07.jpeg
    457.5 KB · Views: 22
Doctors blimey they aren't coming back to work are they Shaun can't have them getting a chill . 🤣🤣

:D there only allowing me sat and Sundays to do the work so maybe :D
 
Just had three days converting gravity hot to unvented in a bungalow, plus re routing all pipes in roof space ready for a loft conversion next year.
Had to move feed and expansion for heating and get it all up and running today. Left at 8.00 tonight.
50 minutes later, text message, water bubbling up through kitchen floor.
The only section of hot pipe in the concrete floor runs from under the bath and across kitchen floor to sink, and it's gone pop.

Only thing I could do tonight was turn off hot water.

But now have to fit in pulling up a real wooden floor and digging out concrete to fix the leak.

Not like I'm busy or anything. Ffs.
 

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock