Discuss Weather in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

rocketmanbkk

Plumbers Arms member
Plumber
Messages
4,113
Meant to be warm this week

Got a job with a chap to help, woman has unvented & bath water stops after about 2 mins running

He's diagnosed it as a valve not letting enough water in to refill fast enough.

Got 3bar pressure on the gauge

Looking forward to it.

Any other interesting (interesting to me is most jobs) being done?

Rct
 
I've got a creamy full system in a bungalow. 4 rads and a duotec with vertical flue. And a boiler swaps on Thursday and Friday.
 
Finish a bathroom tomorrow, install an outside oil combi on Tuesday and then starting a utility room and shower room on Wednesday for 9 days. Starta bath out, shower in on the 21st, an ensuite to start 24th and in between all that I have a job in the sticks to complete and handover which is about a day and halfs work. All completed before 5th October as I'm off to Gran Canaria for a week :)
 
Jonnys back starting his , get ready for it ............ LAST BATHROOM , this time I mean it lol
 
Aye, righty oh, I believe you, thousands wouldnt :)

Nah its herin doors i have to convince shes heard it all before.
Came back off hol last night, guys bathroom who I start tommorow has just gone on hol today, phone never stopped on hol, been out to a job today, christ knows how much it will ring tomorrow, has to be done whilst hes off, so the pressure is on , again !!
Just had enough of the stress , this is the last one !!!!
 
I'm going on the triton shower installer course Tuesday and Wednesday as I've got no work on

Then starting a boiler swap Thursday when my gas man gets back

And starting a bathroom on the 21st
 
I'm going on the triton shower installer course Tuesday and Wednesday as I've got no work on

Then starting a boiler swap Thursday when my gas man gets back

And starting a bathroom on the 21st

Where is the course at plumben ?
 
I've got a creamy full system in a bungalow. 4 rads and a duotec with vertical flue. And a boiler swaps on Thursday and Friday.

I kid you not a bloke i know use to do a pack that sort of size all buy himself in a day !!!
 
Myself got a shower unit and combi boiler to finish , builder was doing it took the money and ran !!!
later in the week cylinder change over plus the usual bits that ring through
 
Status
Not open for further replies.

Reply to Weather in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock