R
Rickster123
Yeah I know the problems with it. But.. He'd lagged it in the loft and put a drain off at the lowest point so that the pipe could be worked on. I mean it had to be repiped because it doesn't meet the contract standards but is there a reg against this because he's certain that there's nothing preventing this being done.