S
supper plumb
How many of you guys get asked or lay MDPE on jobs??? or do you pass it on to groundworks ect
there's an extent as to how dirty some guys are willing to get on a job I dont mind abit of digging and pipe laying it comes with the job i think.
I had to lay 60m of 32mm MDPE water mains and 60m of armored cable for my old boss in the snow only good bit was the digging out and back filling as im cpcs reg so i can drive a digger.
wasn't that nice getting cold and wet covered in mud trying to roll out pipe and cable.
Just seeing how many of you guys still do it or just pass it on
there's an extent as to how dirty some guys are willing to get on a job I dont mind abit of digging and pipe laying it comes with the job i think.
I had to lay 60m of 32mm MDPE water mains and 60m of armored cable for my old boss in the snow only good bit was the digging out and back filling as im cpcs reg so i can drive a digger.
wasn't that nice getting cold and wet covered in mud trying to roll out pipe and cable.
Just seeing how many of you guys still do it or just pass it on