Discuss is it possible to zone upstairs/downstairs in the Plumbing Zone area at PlumbersForums.net

Status
Not open for further replies.

Plastic pipes can’t take direct excess heat that solid fuel stoves will put out.
Especially true when you have an overheat situation (say a power fail) with plenty of very hot water needing to go to heat leaks.
 
My personal preference as regards plastic piping I was trained using copper only plastic piping we would use was hydradare for water mains only time I would use plastic piping is on domestic plumbing for spots I couldnt get copper to.any heating pipework I use copper even if the original pipework was plastic
 
Last edited:
I won't feed the troll anymore.

I will update this later with more pics and explain where everything is.


IMG_20180413_075613117.jpg
IMG_20180413_075651281.jpg
 
Plastic pipes can’t take direct excess heat that solid fuel stoves will put out.
Especially true when you have an overheat situation (say a power fail) with plenty of very hot water needing to go to heat leaks.



What I was of the thinking was, they can't take direct heat so close to the burner or stove. From this stove, your talking 9m linear away from the cylinder.

Back when I built this hpuse, it worked out cheaper for plastic and oil was cheap. Now that I'm upgrading my heating, I can't go replacing all pipes around the house. Talked to numerous plumbers/heating engineers and they all say the stove can be installed along with the oil system if done in plastic.
 
I understand what your saying you don't have to change pipework you are just retro-fitting .the stove the same way if you called me in to fit it I couldn't change all pipework in the original house I would just use copper from the stove we're just trying to help you do it safe and right remember we are looking at this blind and just trying to get a picture in our heads
 
I understand what your saying you don't have to change pipework you are just retro-fitting .the stove the same way if you called me in to fit it I couldn't change all pipework in the original house I would just use copper from the stove we're just trying to help you do it safe and right remember we are looking at this blind and just trying to get a picture in our heads


I totally understand and appreciate it. Im looking to find out how best to zone it of it can be done because don't want to be heating upstairs when not needed or running about turning rads on and off. Now I'm abit worried it's done wrong and can be dangerous.
 
SimonG I think he means connect the stove pipework in copper and do connections in hot press and the existing pipework after the cylinder sounds like the rads are fed in qaulpex that's what I make of it but if he has a plumber doing the work he should be able to answer all this for him
 
SimonG I think he means connect the stove pipework in copper and do connections in hot press and the existing pipework after the cylinder sounds like the rads are fed in qaulpex that's what I make of it but if he has a plumber doing the work he should be able to answer all this for him

If!
 
Status
Not open for further replies.

Reply to is it possible to zone upstairs/downstairs in the Plumbing Zone area at PlumbersForums.net

Similar plumbing topics

Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
441

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock