Currently reading:
What we all working on this week ?

Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,157
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 120
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 67
😂😂 this one's not great if I'm honest (Topps tiles) they often break putting the wedges in but they will do supposed to regularised slate but a few high spots but will be fine once completed.kop
 
Any reason you removed the rad kop new one ?
 
Me too but forget to get pictures. Old Worcester 24 system off and new Baxi 824 system on. Back there tomorrow and Wednesday.
Missing pics from yesterday lads/lasses
 

Attachments

  • 72A96A3A-6E22-4921-B007-D12885FE19CC.jpeg
    72A96A3A-6E22-4921-B007-D12885FE19CC.jpeg
    190.6 KB · Views: 19
  • 5F5D9C2B-F42B-4CC9-9E88-A015A76271D7.jpeg
    5F5D9C2B-F42B-4CC9-9E88-A015A76271D7.jpeg
    157.7 KB · Views: 17
Finished mine off

How you finding it harvest ?
 

Attachments

  • 49D1EE27-63AA-4E14-9655-EF2D590CE8B7.jpeg
    49D1EE27-63AA-4E14-9655-EF2D590CE8B7.jpeg
    75.1 KB · Views: 18
  • 8CBA1661-F7AB-4E85-A726-633FE05623DE.jpeg
    8CBA1661-F7AB-4E85-A726-633FE05623DE.jpeg
    159.5 KB · Views: 16
Just got the powerflush left to do tomorrow. That looks like a beast mate. What size is that.

25kw first time doing a rear flue wasn’t as bad as I thought
 
You small enough to fit in the cupboard to service it Shaun, or do you employ hobbits? 😄

:D I would not fit but luckily the top comes off so it’s all good
 
Bet that’s going to be fun siliconing it :D glad it’s you
 
They're on sheets, about 7" x 10". I'm using mapei flexi rapid set, white and mapei white grout right around. In the wetroom bit I'm using an epoxy grout which is recommended by the former manufacturer.
 
They're on sheets, about 7" x 10". I'm using mapei flexi rapid set, white and mapei white grout right around. In the wetroom bit I'm using an epoxy grout which is recommended by the former manufacturer.

you ever used epoxy grout before ?
 
No, I've used 2 part grout before. What looked like normal grout with a latex additive.

I hear it’s a pita to work with and you need hot water and scouring pads to clean it off best having a word on the tilers forum for tips
 
Got a few more cut and stuck down ready for next week as i am having a day off a tomorrow. Regards Kop

A day off, I wish, enjoy.

Looks like a bit of SAS this week. Saturday and Sunday.

Starting another wet room monday. Have to finish this one. Got an outside tap to do before builders start on Monday up the road. An unvented cylinder to remove. Toilet to fix and a couple of oil boilers to service.

I will get to my 4 day working week next year.
 
A day off, I wish, enjoy.

Looks like a bit of SAS this week. Saturday and Sunday.

Starting another wet room monday. Have to finish this one. Got an outside tap to do before builders start on Monday up the road. An unvented cylinder to remove. Toilet to fix and a couple of oil boilers to service.

I will get to my 4 day working week next year.

A Bit busy then 😁, think of the money though.
 
My first solo UFH job.
Homeowner was project managing/self building, had the screed booked for the next day but hadn’t finished the block and beam flooring :mad:
View attachment 46249
Ive been there mate watch thats spacing and i always put plastic conduit on the last few meters to the manifold to help avoid overheating in that area good luck bud . Kop
 
Ive been there mate watch thats spacing and i always put plastic conduit on the last few meters to the manifold to help avoid overheating in that area good luck bud . Kop
Thanks for the tip. Was a bit of a nightmare job as there were no clear kitchen plans, materials in the way and floor not ready.
Everything was supplied for me on this job but I will make sure I have conduit next time.
 

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock