Discuss unvented electrical controls set up in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

stratplus

Plumbers Arms member
Plumber
Gas Engineer
Messages
963
Anyone point me in the right direction as to how these are wired up. Two two ports, wiring centre, two channel programmer, room stat, boiler, fcu. Is this same as a standard s plan but the cylinder stat is different with the resetable over heat switch And an extra two port as a safety cut out.
 
is an s plan, dont need the extra 2 port, just use the one the cyl manufacturers provide to ensure warranty cover so if you buy an s plan pack you have one left over :)
 
Also alot of unvented tanks come with the reliance cylinder stat, theres already a link wire fitted between the high limit and the control stat so its a straigt foward.
 
Status
Not open for further replies.

Reply to unvented electrical controls set up in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock