Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,157
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 114
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Yep sure do mate what you been working on ??
Same old mate, just lots of boiler repairs, all mundane stuff though, low pressure, f75’s, boiler leaks. It rarely changes. Getting bored and tired of job and tenants, sorry “customers” (not allowed to use the t word :rolleyes: )
[automerge]1606510183[/automerge]
Will collect one from screwfix in the morning. Could do With another option also incase it is too big?

One of these? Talon 110mm Pipe Collar White - https://www.NoLinkingToThis/p/talon-110mm-pipe-collar-white/61841?tc=OB4&ds_kid=92700055281954514&ds_rl=1249404&gclid=EAIaIQobChMIgO3Zh8uj7QIVLCB7Ch1hnAaxEAQYASABEgLCovD_BwE&gclsrc=aw.ds
 
Last edited by a moderator:
I have always called the water supply company in as Shaun stated it's their stopcock and it needs to be accessable and useable, they rely on us to report these faults , if you have the bottle you could freeze the incoming main internally and fit a new stopcock and gain control ? Any pictures . Kop
No pictures sorry but it's just a 15mm copper rising main from under a screeded floor. Called into the job a few times since to see what's happening but apparently they're waiting on the local housing association to turn it off as they reckon it's their responsibility. I've thown my hands up to them and asked them to call me when ready as whoever turns it off only has to be there 10 minutes while I throw a stopcock on. Told them I could use an Aladdin EasyFit Isolator but they said money is an issue. What can you do eh?
 
Definitely cemented in mate. Gave it a poke. It had been painted over.
If your careful H you can cut it level with a grinder and use a floor drain adapter from clay to 110mm its eithier that or live with the collar and redo it the same if you cut the bend as it goes into the floor you should be able to multi tool it and get it out Regards Kop
 
No pictures sorry but it's just a 15mm copper rising main from under a screeded floor. Called into the job a few times since to see what's happening but apparently they're waiting on the local housing association to turn it off as they reckon it's their responsibility. I've thown my hands up to them and asked them to call me when ready as whoever turns it off only has to be there 10 minutes while I throw a stopcock on. Told them I could use an Aladdin EasyFit Isolator but they said money is an issue. What can you do eh?
Freeze it? Would add to the cost though I guess.
 
Not done much today, Changed leaking filling loop valve, investigated boiler noise, Changed a diverter valve and pumped up expansion vessel (as standard), investigate a Carbon monoxide alarm activation (customers hob - poor flame picture) - all boring stuff :(☹☹
 
Boiler service no need for a full strip on this one but did what was needed magna clean doing its job , fitted the hand wash basin in this cloakroom so now completed both projects . Regards kop
 

Attachments

  • PXL_20201201_111346042.jpg
    PXL_20201201_111346042.jpg
    77 KB · Views: 18
  • PXL_20201201_111325801.jpg
    PXL_20201201_111325801.jpg
    85.1 KB · Views: 14
  • PXL_20201202_162653901.jpg
    PXL_20201202_162653901.jpg
    82.4 KB · Views: 15

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top