Hi all,
Our heating set time is 7:30am off. This morning at around 8:35am the pump started to run, water motorised valve opened, and boiler started to operate! This operation ran till 12:15pm (pump stopped, valve closed and boiler stopped), totally around 3hour and 40mins!
====I assume this...