Currently reading:
What we all working on this week ?

Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,157
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 120
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 67
No that’s not what I meant mutley.

multi- finish is the product name.

The usual method is to apply it in two layers, the second being applied whilst the first is still live - it’s getting the timing right that is the trick.
Same again in terms of timing for your final trowel up; too soon it all moves around too much and goes wavy; too late and .... well it’s too late!
 
No that’s not what I meant mutley.

multi- finish is the product name.

The usual method is to apply it in two layers, the second being applied whilst the first is still live - it’s getting the timing right that is the trick.
Same again in terms of timing for your final trowel up; too soon it all moves around too much and goes wavy; too late and .. we’ll it’s too late!

Ah I see Ben-Gee. But, you could keep adding coats on top until you get it to a level you are happy with hey?
 
Nice. What's that onnthe floor under the tiles, levelling compound?
[automerge]1593622865[/automerge]
No that’s not what I meant mutley.

multi- finish is the product name.

The usual method is to apply it in two layers, the second being applied whilst the first is still live - it’s getting the timing right that is the trick.
Same again in terms of timing for your final trowel up; too soon it all moves around too much and goes wavy; too late and .. well it’s too late!

Easy to order a Marshalltownntrowel but getting hold of some finish plaster....in my dreams. Bought a bag of lime and a couple of bags of sand so going to have a go on my garage wall this weekend.
 
Will look nice once complete mate. Pop a few more up once done. You tilling underneath or around the toilet?
Yes mate will do, its the old toilet H i will pull it out tomorrow and lay the rest of the floor with quick set , before installing the bathroom units and sanitary ware.
[automerge]1593628376[/automerge]
Yes Mutley its levelling compound topps fast track stuff goes off quickly and leaves a hard clean surface to tile onto prime with sbr the old floor and before levelling, and again before tiling i couldn't build it up to much nearer to the doorway . Kop
[automerge]1593631525[/automerge]
Looks nice but them floor tiles will be a bit slick with water on them.

Really like the grey wall tiles.
Not that bad bud
 

Attachments

  • Screenshot_20200701-191819_Chrome.jpg
    Screenshot_20200701-191819_Chrome.jpg
    78.9 KB · Views: 19
  • Screenshot_20200701-194221_Photos.jpg
    Screenshot_20200701-194221_Photos.jpg
    53.1 KB · Views: 21
Last edited:
It’s decent stuff but need to prime the floor first

use it to fit a range cooker where the cus didn’t have any more tiles went off like a rocket and hard
 
Three hours to fit an outside tap on a new build this morning, I had a nightmare!
Hardly any space between fittings and the shelf wouldn’t come out. Tightening up the isolation valve and the two soldered tees straight after the stop tap came apart. They were butted together and no solder inside either fitting! Just the lip of either tee.
Easiest £60 I ever made 😅
FBCF3F42-8143-4595-A902-F03BAC09D877.jpeg
 
Three hours to fit an outside tap on a new build this morning, I had a nightmare!
Hardly any space between fittings and the shelf wouldn’t come out. Tightening up the isolation valve and the two soldered tees straight after the stop tap came apart. They were butted together and no solder inside either fitting! Just the lip of either tee.
Easiest £60 I ever made 😅
View attachment 44425
Ugh, I feel for you. I have been there many of times.
 
It should still be a set standard though mate. I want to know who signs this stuff off before the plasterboard goes up and is skimmed.

I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
 
I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
I see it all the time mate. My estate is a new build and there is loads of others by where I live.
 
Lights and fan done today i got the towel rail fitted shower doors installed and sealed up all ready to use. Kop
 

Attachments

  • IMG_20200703_175012.jpg
    IMG_20200703_175012.jpg
    117.1 KB · Views: 18
  • IMG_20200703_175026.jpg
    IMG_20200703_175026.jpg
    91.8 KB · Views: 18
Nothing as nice as that today KOP. Revisit a bathroom I did about 8 years ago to change the bath and basin taps.
The shower enclosure has never been used. Extremely low water pressure due to steel supply pipe, was going to be replaced a couple of months after I did the shower. They still haven't got round to doing it.

20200703_105556.jpg20200703_105549.jpg20200703_105532.jpg
 
All in one worktop Mate?
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop
 
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop
Looks good though mate.

I did these on a Friday
 

Attachments

  • 28C21F1D-9447-4938-ABE9-0121CD45E450.jpeg
    28C21F1D-9447-4938-ABE9-0121CD45E450.jpeg
    143.3 KB · Views: 17
  • 659B1263-9C30-4206-B4D4-4F266DB07A14.jpeg
    659B1263-9C30-4206-B4D4-4F266DB07A14.jpeg
    151.2 KB · Views: 17
  • C007FD5C-9BA6-4012-B172-0D5AC7A94FE3.jpeg
    C007FD5C-9BA6-4012-B172-0D5AC7A94FE3.jpeg
    125.9 KB · Views: 19
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop

I'm finding I'm always changing the guts on toilets before installing when customer supplies. Not worth the hassle of some of the tat you see when you open them up.
It's got to the point now where I just add money on when I do the estimate.
 
Last edited:
Nice job H good to see you back .
Nice H good to see you back bet they will be put to good use next week 😂😂
[automerge]1593962219[/automerge]

Spot on mate turn up on time and no breakages 😄

Thanks mate. Doing more now. But will not be doing as many hours as before lock down. I’m enjoying family time to much if I’m honest.
 
Update chaps job is done and dusted and in use moved on to two kitchen first fixes , and a couple of designer type rads, another shower room to start next week . Regards Kop
 

Attachments

  • IMG_20200707_143928.jpg
    IMG_20200707_143928.jpg
    99.9 KB · Views: 11
  • MVIMG_20200707_143920.jpg
    MVIMG_20200707_143920.jpg
    117.2 KB · Views: 14
  • MVIMG_20200707_143955.jpg
    MVIMG_20200707_143955.jpg
    108.5 KB · Views: 10
Potentially my next job. Oil boiler and unvented cylinder, tie up the underfloor heating, complete first fix for upstairs heating and first fix hot and cold to 3 bathrooms, cloakroom, utility and kitchen.
Then back to complete the bathrooms.

20200708_165426.jpg20200708_165433.jpg20200708_165445.jpg20200708_165455.jpg20200708_165501.jpg20200708_165507.jpg20200708_165523.jpg20200708_165843.jpg20200708_165946.jpg20200708_165951.jpg
 
New posts

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock