Search the forum,

Discuss Shower Tray Advice for install in the USA area at PlumbersForums.net

Messages
49
I have a stone resin tray to install at the weekend. The question I have is the existing flooring is 22mm T&G chipboard. Do I cut this out and put down some 18mm marine ply or just fix the marine ply on top of the existing flooring then 5:1 dry mix mortar and then lay the tray. Also would 20mm deep mortar be sufficient for the mortar base???
 
Cut out chipboard and replace with ply, prime this with acrylic primer or SBR.
Set the tray on flexible cement based tile adhesive making sure entire base is supported - if it’s flat bottomed 10mm is sufficient , if it’s ribbed 4mm is sufficient as it will be much thicker up into the ribs.
Check floor with level first so you know where to put more adhesive. This will make it easier to level the tray without too much adhesive squeezing out.
 
Cut out chipboard and replace with ply, prime this with acrylic primer or SBR.
Set the tray on flexible cement based tile adhesive making sure entire base is supported - if it’s flat bottomed 10mm is sufficient , if it’s ribbed 4mm is sufficient as it will be much thicker up into the ribs.
Check floor with level first so you know where to put more adhesive. This will make it easier to level the tray without too much adhesive squeezing out.

Manufacturers instructions is for mortar, will this not invalidate warranty if using tile adhesive? Also it’s marine ply, is sbr needed??
 
6mm Hardie backer glued and screwed down on top of the chipboard then as Ben gee SBR primer then use flexible tile adhesive to bed it down tried and tested method . Cheers kop
 
Because they haven’t updated their instructions for years to reflect current materials and practice.
The idea is that the tray is set upon something solid that won’t flex and provides full support over the entire area of the base ie NOT silicone, expanding foam etc etc that the plonkers use.
 
Because they haven’t updated their instructions for years to reflect current materials and practice.
The idea is that the tray is set upon something solid that won’t flex and provides full support over the entire area of the base ie NOT silicone, expanding foam etc etc that the plonkers use.

Well I cut out the chipboard this afternoon and I have some no more ply SBR, will brush that on the marine ply and go for the flexible tile adhesive - which do you recommend? Cheers.
 
To be honest any single part flexible is up to this job I would imagine. I occasionally have used the ends of several different bags to clear out the back of my van!
Go to your local tile shop/merchant; grey is cheaper than white, rapid set is cheaper than slow set.
So, grey rapid set single part flexible would be a good choice (S1 class is fine , S2 is not needed and more expensive/ trickier to use )
 

Reply to Shower Tray Advice for install in the USA area at PlumbersForums.net

Similar plumbing topics

The left rear floor corner is highest (the shower pan touches/sits on the floor), sloping down diagonally to the front right corner (lowest). The front right corner shim is 5/8", the left front corner is 3/8" shimmed, with shorter shims under left middle and right rear corner. The pan perimeters...
Replies
5
Views
105
Hello all, I'm would like to extend an existing outside tap to another point in the garden. I'm about to pour a concrete patio and was hoping to run the water line underneath. There are existing drain (and who knows what) pipes running along the same wall so I'm nervous about digging too far...
Replies
6
Views
213
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
173
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
4
Views
382
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m planning to pour a 100mm deep concrete patio on 100mm hardcore. In order to achieve the same final height to line up with the rest of the patio, I...
Replies
6
Views
215
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock