Discuss Plastic pipe on hot/cold to boiler? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
It’s a newish install aswell. Other than advising the customer what are we supposed to do? Cap it? AR it? All I get from colleagues is don’t worry about it, which is annoying.Loads like that mate, min of 1 meter away in my book , but should be more lol .
That’s why it concerned me. I advised the customer that it wasn’t ideal like that and to have it replaced with copper.Nothing to do with gas safe just note down and move on
Only bit I would be iffy is a blow off
That’s why it concerned me. I advised the customer that it wasn’t ideal like that and to have it replaced with copper.
Check with the boiler manufacturer. I'm told one or two have fancy controls fitted that would allow for plastic to be connected directly. Others will say 1m or 1.5m Get their advice.What’s the protocol if we find plastic pipe to boilers(within 100mm)? Found one with the hot and cold piped right into the boilers tails?
I actually called Vokera and they couldn’t give 2 hoots which surprised me.Check with the boiler manufacturer. I'm told one or two have fancy controls fitted that would allow for plastic to be connected directly. Others will say 1m or 1.5m Get their advice.
Reply to Plastic pipe on hot/cold to boiler? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.