Search the forum,

Discuss Managing staff your way in the The Welcome Wagon :) area at PlumbersForums.net

Messages
12
Hi everyone,
Currently just me plumbing but looking to branch out
Just wondering how the employers and users of subs keep their workers working their best:
The pricework way - how do you avoid corner cutting and paying for time repairing cock ups.

On the clock workers paid for time - do you give workers an estimated time you expect it to be finished and how do you make sure they stick to it.

A mix of the two or something different?

By nature i am tempted to go on price as when i started on site i worked in a different trade and the company had 1 team that took 5-6 days to do the job while me and the other team on price did the same job in 2 1/2 - 3 days ( not cutting corners but sweat dripping off us , while they looked relaxed).

Plus any other tips on getting the best out of your workers appreciated . Thanks
 
i.e. pay them well and don’t “track” their movements/time too closely.

Nobody likes to feel they are being “kept an eye on”, trust your workers to do a good job and they will- providing they are good conscientious types, which you are more likely to attract if you pay well...
 
If it's just you, then surely the person(s) will be working along side you for a period of time.
You should be able to weed out the ones that don't suit you.

You may get into trouble if you're pricing works and then sub-contracting the works to others without any supervision
 
I have had staff before and paid decent money worked out at £25 per hour all min 10 years and nvq 3 yet all 3 hired i had to let go as they were not good enough and i gave simple jobs to break them in yet within 3 jobs i had to repair each ones work (so all i know is job centre may be free but didnt work for me).
 

Reply to Managing staff your way in the The Welcome Wagon :) area at PlumbersForums.net

Similar plumbing topics

Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
255
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
120
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
3
Views
179
Hi all I'm hoping someone can shine a light on this for me Since our stop tap on the pavement has now been filled with sand for whatever reason, we are relying on our property fitted stopcock (this is outside on our garage wall) Unfortunately turning this to the closed position only reduces...
Replies
3
Views
174
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m planning to pour a 100mm deep concrete patio on 100mm hardcore. In order to achieve the same final height to line up with the rest of the patio, I...
Replies
5
Views
135
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock