This post just for interest/comment so please only read if you have time for that (Any thoughts appreciated).

Following on from previous post of making good the hole in the wall that I made for the re-plumbing:

Loo Cold Feed and Overflow Rework / Making Good the Wall (Part 4)

. . . This post details final refit of the Loo, completed just before Easter.

AllDone.JPG


From memory (as an amateur) its probably the 4th time I've ever done this.

Points of note here (please re-educate me as required):
1. Work done I assume in wrong order so I've completed all the decorating before the loo re-fit (as the space is so tight)

2. Used silicon spray in the floor waste pipe to make it easy to fit the new waste elbow. Also dipped the other pan end of the waste elbow into hot water for a few mins first so easy to fit, and make sure inner and outer seals in right place.

3. Once pan pushed onto new waste, fit the pan floor screws (measure screw position first from back wall to make finding the holes easy). Don't over-tighten the floor screws (See note below about silicon round the pan)

4. I always go for a galvanised close coupling kit even though they do corrode in time (plastic ones don't look strong enough to me). I do though always put plenty of grease on the coupling kit bolts so you can get them off one fine day.

5. The assembly order I use rightly or wrongly is (working vertically downwards)
  • Syphon
  • Rubber sealing washer
  • Just a hint of silicon on the tank before inserting the syphon with the washer (despite the manufacturers comment this not required)
  • (Tank)
  • Re-used the old rubber washer under the tank as the bottom of the tank isn't completely flat, and I don't want to overtighten anything to make the coupling kit sit flat.
  • Locking nut that comes with the Syphon (don't overtighten)
Here's a photo that shows the fit of the coupling kit against the tank (so the old rubber washer is in the gap, and you can see the tank isn't completely flat):
ExtraRubberWash.JPG


6. Marked the tank and pan centrelines with a marker pen before dropping the tank onto the pan (to make it easy to get them lined up)

7. Reconnect the plumbing, and fill the tank before final tightening of the close coupling bolts (don't overtighten) and the tank wall screws

8. When happy all ok, clear silicon round the pan where it sits on the floor. This makes sure no water gets in and rots the floor around the screw holes, and perhaps as usefully gets the pan more securely fixed to the floor than just the pan screws alone.

Lastly for interest, a photo of the scrapped Yorkshire fitting (not leaking) that was originally inside the wall at the intersection of the left hand and back walls.

Yorkshire.JPG


So I guess other joints behind walls in the house may be similar.
Looks like they added extra solder - technically probably wrong, but I guess that lets you know you have the joint hot enough, when soldering in a tricky location.

I assume most of the corrosion (more behind the joint not shown in photo) comes from the flux that hasn't been wiped off after soldering, rather than the sulphur in the breeze blocks. Wiping off the flux won't be particularly easy when the pipe is right against the blockwork, also in this case at a wall intersection.

So - all done I hope, and many thanks everyone for all the help.

Cheers,

Roy.
 

Reply to Loo Cold Feed and Overflow Rework / Loo Refit (Part 5) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

My sister bought a new build property which has wall hung toilets, NK by Noke Porcelona The pans are all moving enough for the silicone sealant to fail across the top of the pan and if you put a bit of weight on it it opens up by about 5mm. They've been in use (light use 4 toilets in a holiday...
Replies
4
Views
774
Hi Everyone, For those who like a long read but I could rally do with some advice. Might be a bit long this. For background. A gardener/landscaping friend of mine is going to install an irrigation system in a customer's garden. He asked me to pop around and measure the pressures and flowrates...
Replies
3
Views
232
Afternoon, our bath waste pipe in our rented property has started leaking slightly when we shower. We've narrowed it down to a loose screw in the centre of the plughole. My understanding is that this screw being loose means that water is able to leak out between the bath waste and the waste...
Replies
1
Views
525
Hello everyone Moved into a 5 year old ‘new build’ property recently and the toilet was leaking from where the tank meets the bowl. Nothing heavy but enough to need repairing. Anyway Found out that the toilet tank was leaning very far back and fixed to the wall. The only way to stop the leak...
Replies
4
Views
892
Hi Just had a new bathroom installed with a toilet bowl that reaches the back wall. Its has a bottom entry cold feed to the cistern. The fitter put an isolation valve on the pipe work for this :-(, the copper pipe comes up from a plastic pipe push fit. See photo. I did a tissue paper test and...
Replies
12
Views
1K
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock