I have 2 lpg gas bottles outside the barn with new combi boiler inside.
my entire plumbing inside the cottage is now redone in plastic apart from feeds to the boiler.
the boiler is close to a sink
Can anyone suggest what earthing I will require and is any earth bonding required under the boiler?
Can I connect into an under counter earth terminal within a double socket which goes directly back to the CU and if so would an RCD socket be a safer option?
Or can I put in a new copper earth rod just outside near the bottles and connect a second earth to some part of the gas or water feeds ?
not sure if you can have 2 earth rods feeding the same property ?
many thanks in advance
my entire plumbing inside the cottage is now redone in plastic apart from feeds to the boiler.
the boiler is close to a sink
Can anyone suggest what earthing I will require and is any earth bonding required under the boiler?
Can I connect into an under counter earth terminal within a double socket which goes directly back to the CU and if so would an RCD socket be a safer option?
Or can I put in a new copper earth rod just outside near the bottles and connect a second earth to some part of the gas or water feeds ?
not sure if you can have 2 earth rods feeding the same property ?
many thanks in advance