Search the forum,

Discuss Day 6 Advent Calendar! in the USA area at PlumbersForums.net

Status
Not open for further replies.
5-8 days from receipt of instrument
 
Welcome to the Day 6 of the PlumbersForums.net Advent Calendar Competition.

Today's Question

How long does it take for @Test4Less to complete calibration on your instruments?



Hint

Today's Winner Will Get:-
[/QUOTE
Welcome to the Day 6 of the PlumbersForums.net Advent Calendar Competition.

Today's Question

How long does it take for @Test4Less to complete calibration on your instruments?



Hint

Today's Winner Will Get:-
Calibration typically takes 5-8 working days from us receiving the instrument
 
5—8 days to calibrate after receipt of instrument....regards Turnpin:)
 
Status
Not open for further replies.

Reply to Day 6 Advent Calendar! in the USA area at PlumbersForums.net

Similar plumbing topics

I want to reconnect some outbuildings to an existing water supply. The supply pipe is old 22mm MDPE and buried for a fair distance so not going to dig it up and replace it 😬. Question is can I use normal 22mm plumbing push-fit connectors to make the connection as finding 22mm MDPE fittings...
Replies
1
Views
252
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
301
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
168
  • Question
Ideal Logic 24, Previous problem was that the hot water was only cold or barely warm if the heating was in use. If heating was off and boiler cold then would get hot water most of the time. Changing the flow cartridge about 2 years ago (when I moved in) solved this problem enough to suffer it as...
Replies
1
Views
75
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m planning to pour a 100mm deep concrete patio on 100mm hardcore. In order to achieve the same final height to line up with the rest of the patio, I...
Replies
6
Views
212
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock